• Write a Review

10-Foot Extra Long Leader and Extension Hose, 5/8-inch

# HSE10
In Stock
$ 12.99
Weight: 1.710000 lbs

Provides the reach you need!

At a full 10 feet, this leader and extension hose is ideal for use with hose bib extenders and allows you to place hose reels farther from the faucet. 5/8-inch inner diameter. Four-ply hose has a wall thickness of 1/8 inch. Made in the USA.

Specs

  • Ship weight: 2 lbs
  • Four-ply material
  • 5/8in. inner diameter
  • Wall thickness of 1/8in.
  • 10 feet long
  • Made in the USA

Review Summary

Customer Reviews for 10-Foot Extra Long Leader and Extension Hose, 5/8-inch

No Reviews

Provides the reach you need!

At a full 10 feet, this leader and extension hose is ideal for use with hose bib extenders and allows you to place hose reels farther from the faucet. 5/8-inch inner diameter. Four-ply hose has a wall thickness of 1/8 inch. Made in the USA.